Printer friendly version Share

News Release

Nespoli performs hot-swap of faulty valve on Columbus

13 April 2011 European Space Agency (ESA)

ESA's Columbus module on the International Space Station carries a number of life-support systems, including the Thermal Control System, which cools all the equipment and scientific payloads in the orbiting research module.

The thermal system has multiple valves that control the cold water flowing through pipes. The water pipes run from Columbus to the Station's Node-2, where heat exchangers cool the water using radiators. The cooled water then flows back into Columbus.

What went wrong

In 2010, one of the water valves experienced problems and was inspected several times by Station astronauts to assist engineers with troubleshooting.

Finally, in September last year, the suspect No. 8 Water ON-OFF Valve (WOOV) failed to react to ground commands and stopped working completely

"WOOV No. 8 can be commanded remotely by the crew or from ground as well as manually operated by the crew," explained Zoltan Szigetvari, Senior System Engineer for Columbus Thermal and Environmental Control Systems at Astrium.

The valve that failed to operate

"No. 8 failed to operate even after crew intervention and it was decided to replace it by a manifold, which will allow continued nominal operation of Columbus, and download the failed valve for investigation," he added.

The crew also reported traces of an unknown substance seeping out of the valve body and the insulation shell.

Replacement required an in-orbit repair job, and it was decided to return the faulty valve to Earth for detailed analysis.

A thorough troubleshooting plan was mapped out, aiming to identify the root cause of the valve jamming and the nature of the contamination.

"The contamination could not be explained and was declared toxicity level 2, meaning that the astronauts should not come into contact with it," said Eugenio Gargioli, Engineering Support Manager for Columbus at Thales Alenia Space.

"Once we examine it, and collect samples of the unknown substance for detailed chemical analysis, we can establish a strategy for treating potential failures and provide instructions to the crew for handling the deposits that have been detected at this and also on other, similar, Columbus valves."

As a replacement, Thales Alenia Space made a new manifold, which was launched on Shuttle Discovery on the STS-133 mission on 24 February.

Can we fix it? Yes we can

On 27 February, ESA astronaut Paolo Nespoli rolled up his sleeves to work on what was termed 'major in-flight maintenance' – an hours-long repair job requiring tight coordination between the astronaut in space and engineers at ESA's Columbus Control Centre, near Munich, with continuous voice and video contact.

"The main repair included a procedure of some 80 steps," said Cesare Capararo, of ALTEC Lead Increment Flight Director for Columbus and responsible for overseeing the repair.

"Each step had to be carefully checked before, during and after execution by Paolo and the ground team due to the complexity of performing maintenance on a running system."

Detailed engineering analysis

With the job complete, the faulty valve was packed for return to Earth on the same Shuttle. After arrival at NASA's Kennedy Space Center on 9 March, it was shipped to the Astrium facility in Bremen, Germany, where Columbus was built, for analysis by engineers from Thales Alenia Space, Astrium and ESA.

"We will have the results very soon, which will help to determine the cause," said ESA's Roland Luettgens, Mission Director at Columbus Control Centre.

"Columbus must operate several more years and therefore it's important to know the cause and ensure that we can work together with the crews for this type of complex maintenance."

http://www.esa.int/SPECIALS/Operations/SEM4OR4SZLG_0.html

Attached files

  • ESA astronaut Paolo Nespoli removes the failed valve. Credits: ESA


  • With the blackness of space and the Earth's horizon as a backdrop, astronaut Ron Garan completes the third spacewalk of the STS-124 mission. ESA's Columbus laboratory is seen in the foreground of the picture. Credits: ESA


  • A team of engineers from Thales Alenia Space, Astrium and ESTEC perform the first inspection after arrival of the valve on the 15 March in Bremen. Credits: ESA


  • Columbus Control Centre, Oberpfaffenhofen, Germany. Under the call sign 'Munich', the Columbus Control Centre will, from 2007, be responsible for systems on board the orbiting Columbus laboratory and for European science activities on board the ISS. The centre is already building operational expertise during ESA's Astrolab Mission. Credits: DLR


App animated no finger Facebook-Twitter3 Elhuyar-kom WCSJ ad eNEWS ad2